1.Paving the first tile, leaving an appropriate distance (use with cross spacer), close to the tiles.
2.Insert T-shaped needle along the gap in the tile.
3.Then 180 degree rotation,T-shaped needle stuck at the bottom of the two tiles.
4.Adjust the caps with your hand/special wrench until the two tiles are on the same level.
5.About 4-6 hours after leveling, Before cement/adhesive is completely dry, rotate caps in the reverse direction, remove 180° T-needle until the word, take out.